UFUPI
- Msalaba – Sehemu ya kubuni msalaba wa octagonal boom – section design is widely adopted. Sio tu inapunguza ubinafsi – uzani lakini pia inaboresha kwa kiasi kikubwa nguvu ya silinda ya boom na anti yake – utulivu wa extrusion.
- Juu – performance Operating Capacity It has a stronger lifting capacity and a wider lifting range.
- Usanidi wa busara Kuna usanidi wa hiari wa hiari. Mbali na usanidi wa kawaida, wateja wanaweza pia kuchagua vitendaji kama vile kidhibiti cha mbali – uendeshaji wa udhibiti, mbili – kasi winch, dakika – kikomo na ulinzi wa overload, kikomo cha urefu, radiator, nk. Mipangilio hii inaweza kuboresha ufanisi wa kazi na kuhakikisha kuwa operesheni ya kuinua ni salama na ya kuaminika zaidi.
- Protection System There is pressure overload protection. Vipimo hufanywa kwa uwiano tofauti wa mzigo, na sauti tofauti za kengele. Vipimo vya kawaida huhakikisha kuwa inaweza kukidhi hali mbalimbali ngumu za kufanya kazi.
VIPENGELE
The Nambari 18 Ton lori telescopic crane represents a pinnacle of engineering prowess, tailored to meet the rigorous demands of heavy – lifting operations across multiple industries.
Robust Lifting Capacity
At the heart of this remarkable machine lies an 18 – uwezo wa kuinua tani, enabling it to handle substantial loads with ease. In construction projects, it can effortlessly hoist large – scale steel beams, pre – fabricated concrete elements, and other heavy construction materials. Whether it’s erecting a multi – story commercial building or building a large – scale industrial facility, the crane’s powerful lifting capabilities ensure that the project progresses smoothly. The advanced hydraulic system provides consistent and stable lifting force, even when operating at the maximum load limit, guaranteeing the safety and efficiency of the lifting process.
Flexible Telescopic Boom
Kuongezeka kwa telescopic ya Sany 18 – ton crane is a marvel of engineering. It consists of multiple telescoping sections that can be extended and retracted precisely. This allows operators to reach various heights and distances as required by the job. Kwa mfano, katika ujenzi wa daraja, the crane can reach across long spans to place bridge segments accurately. In the installation of large – scale power generation equipment, the telescopic boom can access different parts of the machinery for assembly. The smooth operation of the boom, controlled by advanced hydraulic technology, ensures that the crane can adapt to complex work scenarios.
Superior Mobility and Maneuverability
Mounted on a sturdy and well – chasi ya lori iliyoundwa, this crane offers excellent mobility. It can be rapidly transported from one job site to another, reducing the time and cost associated with equipment relocation. The truck’s design also endows the crane with remarkable maneuverability. It can navigate through congested construction sites, narrow access roads, na maeneo magumu ya kazi. This makes it highly suitable for projects in urban areas or sites with limited space, enhancing its overall utility and productivity.
Comprehensive Safety Measures
Usalama ni kipaumbele cha juu katika muundo wa sany 18 – tani Crane ya Telescopic ya lori. It is equipped with a suite of safety features. Mzigo – moment indicators continuously monitor the load and the crane’s working conditions, immediately alerting operators when the load approaches the limit to prevent overloading. Anti – mbili – block systems are installed to prevent the hook from colliding with the boom, a common cause of accidents. Vipindi vya nje vimeundwa kutoa utulivu wa hali ya juu wakati wa kuinua shughuli, na zinaweza kurekebishwa kulingana na hali ya ardhi. Kwa kuongeza, the operator’s cab is ergonomically designed to reduce fatigue and provide a clear view of the work area, kuimarisha usalama zaidi.
Uimara na matengenezo ya chini
Imejengwa na juu – Vifaa vya ubora na mbinu za hali ya juu za utengenezaji, Sany 18 – ton crane ni ya kudumu sana. Vipengele vyake vimeundwa ili kuhimili hali ngumu ya nzito – matumizi ya wajibu, such as extreme temperatures, vibrations, and continuous operation. Ujenzi thabiti hupunguza mzunguko wa milipuko na mahitaji ya matengenezo. Hii sio tu kupunguza muda wa kupungua, lakini pia hupunguza muda mrefu – gharama za uendeshaji wa muda, kuifanya gharama – effective investment for businesses.
MAALUM
| Kuinua uwezo | |
| Ilikadiriwa kuinua mzigo | 18000 kilo |
| Ilikadiriwa kuinua wakati | 45 t · m |
| Kuinua anuwai ya mzigo | |
| Urefu wa msingi wa boom | 6.23 m |
| Idadi ya sehemu za boom | 5 |
| Upeo wa kuinua urefu | 21.5 m |
| Upeo wa Kuzidisha Hook | 6 |
| Urefu wa boom uliopanuliwa kikamilifu | 19 m |
| Upeo wa kufanya kazi | 18.6 m |
| Angle ya Slow | Mzunguko kamili |
| Anuwai ya pembe ya luffing | 0 – 75° |
| Vigezo vingine | |
| Span ya nje (Kupanuliwa kikamilifu) | 7.25 m |
| Shinikizo la mfumo uliokadiriwa | 32 MPA |
| Kiwango cha mtiririko wa mfumo uliopendekezwa | 80 – 110 L/min |
| Kiasi cha tank ya mafuta | 300 L |
| 3 Vigezo muhimu zaidi | |
| Ilikadiriwa kuinua mzigo | 18000 kilo |
| Urefu wa boom uliopanuliwa kikamilifu | 19 m |
| Uwezo wa juu wa kuinua | 18000 kilo |
| Upeo wa kuinua urefu | 21.5 m |












Ukaguzi
Bado hakuna hakiki.